Sabit Trumov

Sabit's Professional Knowledge Book

Professional Knowledge Book

A professional knowledge system for materials, maintenance, procurement and data: the business problem, the decision rule, the professional judgement and the experience behind it.

Business problemDecision ruleProfessional judgementDecision LabExperience

10
articles
6
chapters
4
with formulas
6
Decision Labs
Chapter 013 articles

Materials Management

Min-Max, safety stock, reorder point, excess, slow-moving and dead stock, critical spares and availability.

  • 1.1Materials Management

    Excess Prevention Before Purchase

    A purchase decision should consider available stock, open supply, reservations and the maximum stock level, not PR quantity alone.

    Inventory control · Demand review

    Decision LabFormula6 min read

  • 1.2Materials Management

    Reorder Point

    Reorder point links demand during replenishment lead time with the protection provided by safety stock.

    Inventory planning · MRO spares

    Decision LabFormula5 min read

  • 1.3Materials Management

    Obsolescence and Alternative Material Logic

    Obsolescence is not only a purchasing problem. It is a lifecycle risk linking equipment, stock, technical equivalence and future maintenance demand.

    Lifecycle management · Technical equivalence

    Decision Lab5 min read

Chapter 021 article

Maintenance Materials

Planned and corrective demand, turnaround materials, criticality, readiness, spare-parts strategy and equipment BOM.

  • 2.1Maintenance Materials

    Availability, MTBF and MTTR

    Materials readiness influences maintenance performance because an unavailable spare can turn a repair task into extended downtime.

    Reliability · Maintenance materials

    Formula5 min read

Chapter 032 articles

Procurement

Technical and bid evaluation, supplier evaluation, framework agreements, expediting and total cost of ownership.

  • 3.1Procurement

    Total Cost of Ownership

    The cheapest quotation is not always the lowest-cost decision over the full lifecycle.

    Procurement · Lifecycle cost

    Formula4 min read

  • 3.2Procurement

    Technical Evaluation Decision Chain

    A recommendation is stronger when every decision can be traced from requirement to bidder evidence, clarification and final outcome.

    Technical evaluation · Procurement governance

    Decision Lab4 min read

Chapter 042 articles

SAP / Data

SAP PM and MM, material master, BOM, cataloguing, noun-modifier, duplicates, master-data quality and SPIL.

  • 4.1SAP / Data

    Data Is a Signal, Not the Decision

    SAP gives critical transactional context, but professional judgement is needed to interpret whether a material requirement should be purchased, transferred, held or challenged.

    Decision governance · SAP data

    4 min read

  • 4.2SAP / Data

    Material Data Must Connect to Equipment

    A technically correct spare part loses value when its description, manufacturer and part number, UoM or equipment linkage is incomplete.

    Master data · BOM · Cataloguing

    4 min read

Chapter 051 article

Preservation

Preservation, storage conditions, shelf life, corrosion risk, packaging and fit-for-use.

  • 5.1Preservation

    Preservation as an Operational Risk Control

    Stored material is only valuable if it remains identifiable, protected, documented and fit for use when maintenance needs it.

    Storage readiness · Risk control

    Decision Lab4 min read

Chapter 061 article

Management & Governance

KPI, RACI, governance, process improvement, risk, workflow design, digitalisation and continuous improvement.

  • 6.1Management & Governance

    Visibility Changes Behaviour

    Dashboards are useful when they convert backlog, stock, procurement and readiness signals into ownership and action.

    Management governance · KPI

    4 min read

Decision Lab6 labs

Decision Labs

Illustrative scenarios where you choose a decision and compare it with a professional review. Not a test: there is no score, only reasoning.